You are here:

Geophysics/Experts

There are no experts in this category at this time

View Past Answers

Volunteer to be an expert in this category

Recent Answers

2009-11-06 Conversion Vrms from float to final datum:

Hello Abdelkader, You just need to convert it into interval/average velocities. Use Dix-equation, that should be applicable in datum calculations too. Because, there is not difference between arbitrary

2009-11-02 minimun/zero phase wavelet:

Good Morning Fatiha, The minimum phase wavelet correspond front loaded energy i.e. at time zero minimum energy and elsewhere maximum. While zero phase wavelet has maximum energy at time zero. Most of

2009-10-30 workover:

Hello Fatiha, If you are talking about the term "Workover", which is used in the drilling/production plans, then I can add something. Workover is a drilling operation that is meant to increase the production

2009-10-10 depth calculation:

Hello, Yes, you are doing correct almost. Here is the Dix equation. You convert the RMS velocities into interval velocities from those interval velocities you derive the average velocities. Please note

All Answers

Answers by Expert:


Ask Experts

Volunteer


©2009 About.com, a part of The New York Times Company. All rights reserved.