| Recent Answers from Dave Coil |
 |
2008-11-29 Final Inspection: You are only responsible for work under the permit...and the codes involved with the date on the permit. The building department needs final on all electrical connections...with bulbs...final on all plumbing...
|
2008-11-27 Finishing Basements: This may sound humorous.... Green board is required in a bathroom where tile may be installed. Green board is designed to deteriorate complete if you have a water leak...to pinpoint, or announce a leak...
|
2008-11-24 stucco exterior: Education time. Stucco is 7/8" to 1" thick "concrete" layer. EIFS is an exterior insulated finish system...this is not permitted in most states because of the possible mold issue. Nevada allows it....
|
2008-11-19 Garage door problems: In my opinion..you, or your handyman...pull the plug. 5 minutes worth. Change all the settings..up/down travel and force. Make sure the travel distance is less in both directions. Then reset all limits...
|
2008-11-18 basement walkout door: I hope I can make this sound simple. Lets use a 36" door for example. The door jamb needs 38" wide and 82" tall. If you want to attach stud work to the opening to make the door easier to hang...add...
|