You are here:
K = Knowledgeability C = Clarity of Response P = Politeness N = Nominated for Expert of the Month
| Date | User | Subject | K | C | P | N | Comments |
|---|---|---|---|---|---|---|---|
| 2013-03-05 | steve b | in ground spa controls | 1 | 1 | 10 | No | |
| 2013-02-09 | les pri | cracks in mortar joints | 10 | 10 | 10 | No | |
| 2013-01-23 | karl le | In Ground Gunite Pool | 1 | 1 | 10 | No | I never mentioned a need to FILL the pool. I asked about LEVELLING the pool (which would entail draining the pool/drilling holes/pumping mud into holes to obtain a level condition of the entire pool; and wondered if this type of process would crack/damage any underground piping. I did not get a satisfactory answer and presume the responder has had no previous experience with my problem and/or question. But thanks anyway for at least a reply./KL |
| 2013-01-18 | Janette | spa chlorine generator | 10 | 10 | 10 | No | Thank you very much for the reply. I appreciate your response. |
| 2013-01-09 | rod | downsizing pool | 10 | 10 | 10 | No | thanks. since it sounds like downsizing might be possilbe I can get go ahead and get some local bids. |
| 2012-07-24 | Dan | Not to open | 10 | 10 | 10 | Yes | |
| 2012-07-22 | Dan | Not to open | 10 | 10 | 10 | Yes | |
| 2012-06-14 | Darlene | Pool expansion | 10 | 8 | 10 | No | |
| 2012-05-31 | Will | Very bad pool stains | 9 | 10 | 10 | No | |
| 2012-05-31 | Will | Very bad pool stains | 9 | 9 | 10 | No | |
| 2012-05-22 | Ricardo | replacement of main drain | 10 | 10 | 10 | No | thank you very much for your quick response and information |
| 2011-10-18 | Lynn | underground pool lines | 10 | 10 | 10 | No | Thank you very much for your speedy reply. |
| 2011-09-14 | dan | close | 10 | 10 | 10 | No | |
| 2011-09-14 | dan | shock | 10 | 10 | 10 | Yes | |
| 2011-09-01 | dan | shock | 10 | 10 | 10 | Yes | thaNKS |
| 2011-08-25 | Dan | leak | 10 | 10 | 10 | No | |
| 2011-08-11 | Bill | Plastic Trim between top | 10 | 10 | 10 | Yes | |
| 2011-08-07 | Dan | vacuum | 10 | 10 | 10 | No | thanks |
| 2011-08-07 | Bill | Plastic Trim between top | 10 | 10 | 10 | Yes | Thank you for your very prompt response. I will try to find a local outlet for the plastic water stop. Bill |
| 2011-07-17 | dan | metal | 10 | 10 | 10 | No | thanks |
| 2011-07-12 | Dan | chemicals | 10 | 10 | 10 | No | Thanks!!!!!!!! |
| 2011-07-12 | Dan | filter line | 10 | 9 | 10 | No | THanks |
| 2011-03-07 | MB | indoor pool walls,ceiling | 10 | 10 | 10 | Yes | Thank you for your input ....... I found it to be most helpful! MB |
| 2011-02-21 | Jim | Spa Seats | 10 | 10 | 10 | No | Thank you very much! |
| 2010-11-05 | Randy | pool pvc pipe | 10 | 10 | 10 | No | |
| 2010-08-30 | george | cracks in pool plaster | 10 | 10 | 10 | No | |
| 2010-08-17 | gary | tiling | 10 | 10 | 10 | No | |
| 2010-08-09 | Jim | Pool water turnover rate | 7 | 7 | 10 | No | I thank you for your timely answer to my question. It is clear that English is not your native language but as a monolingualist, I admire those who have the ability to communicate in a second language. Again, thanks for your response.
Jim Elsevier |
| 2010-08-05 | Eduardo | Excess cement paste on | 10 | 10 | 10 | No | |
| 2010-07-30 | Eduardo | Excess cement paste on | 10 | 10 | 10 | Yes |
Answers by Expert:
Planning, Design, execution, Installation, maintaining, FINA/SPATA/ISPE standards,Trouble shooting in water, Design of filters,U.V, Rain water harvesting, waterparks, themeparks, amusement parks, playground equipments, water slides and spas, Tiling, waterproofing, Feasibility studies
Last fifteen (15)years water industry Especially waterparks, wavepools, swimming pools, spas,
Organizations
H2O The water Specialist
website:- waterparks.in
Education/Credentials
B.E. major in Construction Engg.
M.B.A. Finance
Past/Present Clients
JVPD club India, MCF club India, HFIL in India